How To Shingle The Peak My Roof
Then snap a chalk line and trim them off with a hook blade in your utility knife.
How to shingle the peak my roof. Leaving one side of the cut piece straight bend the other side to match the peak of the roof as shown below. Butt the edge of the first cap shingle along this line. Cut and bend a shingle to conform to the shape of the peak of the roof. Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge.
If you hit a stack vent or chimney interlace the shingles with the flashing to allow water to run down the roof. They fit into any standard utility knife just like straight blades. Later you will cover it with a ridge shingle. This nailing area is right where you see the dabs of black asphalt cement that are just above the tab knockouts.
Many pros shingle in a vertical line up the roof because it s much faster. It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a weatherproof. Very good info my question i live in florida i m having a house built the structure for the roof was put on and plywood sheets were cut to fit felt paper was put on a week later the hurricane hit and tore off all the felt paper the roof was bare for 2 weeks in rain conditions now its a total of 4 weeks with no shingles in the rain also the plastic moisture has been torn up should i make. A continuous bead of asphalt could trap condensation or windblown water under the roofing at some point.
The shingles at the peak of your roof are commonly called cap shingles. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Put in one 2 inch long nail back 6 inches from the edge of the cap shingle. Overlap the shingles to cover the nails on the side edges and use roofing cement to cover the nail heads on the shingle at the end of the roof.
For nice straight lines run shingles over the edge of the roof. When you reach the peak either bring the ridge edges together with a ridge capping layer or cut regular shingles into 3 tabbed equal pieces and bend them so they fit on the roof peak. If your shingles are standard three tab shingles the caps are made by cutting one shingle into three separate parts. Measure down 6 inches from the center of the roof ridge and chalk a line parallel with the ridge.
Hook blades are used for cutting shingles. If the overhang is more than a foot cut some off and use the remainder elsewhere.