How To Shingle Roof Hip
These chalk lines will serve as a guide for subsequent even numbered rows of shingles and odd numbered rows respectively.
How to shingle roof hip. Snap a vertical chalk line from the inside edge of the first shingle on the second row to the top of the roof and from the inside edge of the first shingle to the top of the roof. Have one person lay shingles in the proper place and another person nail shingles down. That s how the guys. The second step involves placing the first shingle on your roof.
How to shingle a hip roof ridge will be done as follows. Move the roll of felt which you ve now severed from the strip on the roof up and out of your way. Get some friends to help you shingle the hip roof. Once all your shingles are installed you ll need to cover cap the ridge and hip ridges if you have a hip roof.
Snap a couple of guide lines just a little inside the perimeter of the ridge so the lines get covered up when you re done. Bending and overlapping these flaps the guys would put two more nails to anchor it in place. Continue rolling out the felt until you reach the roof hip on the other end. A hip roof is a common roof style characterized by 2 pairs of opposing faces sloping downward from a high peak.
Make sure you re wearing a pair of heavy work gloves and then trim the sides of the shingle with a utility knife so it matches the angle of the ridge it is against. The top ridge cap shingles will overlap the hip ridge cap so start with the hips. To make the shingle flush they would cut a short slice parallel with the ridge. If you re putting down new roofing materials on your home or another building with a hip roof your first step will be to find the exact dimensions of each of the roof s individual faces then use those measurements to calculate its total area in square feet.
Lay down several lines at once to save time. Cut the felt in a straight line so that the bottom edge of the felt extends 8 inches past the roof hip. The guys would cut a second shingle to overlap the back half of the first one. Place the first shingle on the roof so that the bottom of it is even with the edge at the bottom.
The hip shingles continued all the way to the ridge and that last shingle was cut to length so as to avoid covering the open ridge rafter.