How To Shingle Peak Roof
Nailing the cap.
How to shingle peak roof. Preparing the roof 1. This picture gives you an idea of the condition of the existing roof plywood and you. Place the second step flashing piece over the end shingle in the first course by positioning it 143 mm 5 5 8 above the bottom edge of the exposed asphalt shingle. Overlap the shingles to cover the nails on the side edges and use roofing cement to cover the nail heads on the shingle at the end of the roof.
Make sure that the tab of the shingle in the second course will cover it completely. How to cap an asphalt shingled roof preparing the peak. Put in one 2 inch long nail back 6 inches from the edge of the cap shingle. Remove old shingles and.
You ll need longer nails for this part as you re driving through more layers of shingles. Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge. Secure the horizontal flange to the roof. The original plan was to preserve a portion of the existing roof since.
Secure the last ridge cap shingle with four nails at the corners of the shingle and cover the nail heads with roofing cement. Measure down 6 inches from the center of the roof ridge and chalk a line parallel with the ridge. This nailing area is right where you see the dabs of black asphalt cement that are just above the tab knockouts. The cap must be positioned to minimize wind and weather damage after it has been nailed down.
Lay the last ridge cap shingle in the center of the shed roof on top of the exposed adhesive portions of the two center ridge cap shingles. It generally takes three bundles of shingles to cover 100 square feet. Get the right number of shingles for the job. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
It must be completed at the very end. If your eave is one straight length then pick an end and work to the other. Capping a roof is the last thing done during a roofing project. Measure the length of a shingle as it lies across the roof.
Butt the edge of the first cap shingle along this line. Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back and one in the front. This will help determine how the shingles will lay on the. You can either use special shingles called ridge shingles or cut a number of regular shingles into 3 tabbed equal pieces and bend each so they fit snugly on the roof peak and nail them into place.
Positioning of the cap. How to shingle a roof 90 pics pro tips recommendations step 1.