How To Roof Tar Paper
Lay the first strip of tar paper side to side with its bottom.
How to roof tar paper. On a steep roof you can adhere the bottom half first then pull off the backing from above. Measure the width and height of each section separately. Step 5 secure ends. Lay the next strip.
Setting the roll and then nailing off. Starting a roof with tarpaper felt. Unroll the paper on the roof and cut it to the correct length with a utility knife. An assumption is made all materials are ordered based on the necessary measured requirements.
Step 4 over the peak. Often you can reroll it then unroll it while peeling off the paper backing. Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof. One professional tip of note be sure and have a second ladder at the opposite side of the work area.
This video walks through the very basic steps for installing tarpaper felt. How to install roofing tar paper. Use a ladder to reach the bottom level of the roof. Step 3 overhang paper.
How to install roofing paper. Step 1 prep the area. Clean the decking as well as. Once the tar is applied tar paper can be carefully placed on top of the hot tar using a mop to sink the paper into the asphalt.
Afterward multiply them to calculate the area. Begin at the bottom edges of the roof and go up. Avoid creases and stay aligned with the chalkline. Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Make at least three layers. Step 2 roll it out. Continue this for each surface of your roof. Overlapping the tar paper layers to create a seal.
Multiply the width by the height for the. Measure the size of your roof in square feet. Using the chalkline as a guide roll out about 12 feet of wsu smooth and free of creases and bubbles. For example if its length is 120 inches 10 ft and its width is 240 inches 20 ft the area is 28 800 square inches 200 sq ft.
Begin your first row of tar paper with the bottom of the tar paper.